How electrical engineering manufacturers control the cable part during power installation

Your current location : Home >> News >> Shunming News

How electrical engineering manufacturers control the cable part during power installation

作者: Release Date: 2018-12-29 Author: Click:

How electrical engineering manufacturers control the cable part during power installation

First, the power installation control cable directly transmits power from the power distribution point of the power system to the power connection lines of various power distribution equipment. The rated voltage of power cables is generally 0.6 / 1KV and above, and the control cables are mainly 450 / 750V. In the production of power cables and control cables of the same specifications, the insulation and sheath thickness of the power cables is thicker than that of the control cables.  

Control cables belong to electrical equipment cables. The standard for control cables is 9330. The color of the insulated core of the control cable is generally printed in black and white. The cross section of the control cable is generally not more than 10 square. Control cables are used to transmit control signals. The number of cores is large. According to the standard, there are 61 cores, but they can also be produced according to user requirements.  

电气工程厂家在电力安装时如何控制电缆部分

2. The problem of laying of power cables should be taken into account when civil engineering works, and the laying of power lines assists the completion of civil engineering. Power installation companies usually complete the laying of cables. The auxiliary power installation standards generally required in the project are: reserved holes, embedded parts that meet the design requirements, the embedded parts are installed firmly, and the strength is qualified; cable trenches, tunnels, and shafts The floor and screed work at the manholes and other places were completed, the cable trench was drained without water, and the facilities such as cable along the line were removed. The site is cleaned, the road is clear, and the trench cover is ready. The scaffolding for laying the cables is completed and it meets the safety requirements. The lighting illumination along the cables meets the construction requirements. The buried cable trench is dug as shown in the figure, the cable well is bricked and plastered, the bottom sand is paved, and the debris in the trench is removed. The cover and sand are transported to the ditch; all electrical equipment and power equipment distribution cabinets in the power distribution room are installed; cable bridges, cable trays, cable supports, cable passing pipes, and protection pipes are installed and inspected.  

The conditions for the safe use of the laid line are: all material specifications and voltage levels should meet the design requirements and a product certification; each cable should be marked with the cable specification, model, voltage level, length, and date of manufacture. The cable shaft should be intact; the appearance of the cable is intact, the armor is free of rust, mechanical damage, and no obvious wrinkles and distortions. Oil-immersed cables should be well sealed without oil leakage and oil leakage. There is no aging and cracks in the outer sheath and insulation of the rubber sheath and plastic cable; there should be no obvious corrosion of various metal steels and no burrs in the tube. All fastening bolts should be galvanized; other ancillary materials: cable cover, cable marking post, cable sign, paint, gasoline, lead seal, stearic acid, white tape, rubber bag, black bag, etc. Should meet the requirements.


URL of this article: http://pcyisheng.com/news/421.html

Keywords: Shenyang Electrical Engineering , Shenyang Electrical Installation , Electrical Installation Engineering

Recently Viewed:

    online service
    share it One-click sharing
    Welcome to leave us a message
    Please enter your message here and we will contact you as soon as possible.
    Name
    Contact person
    phone
    Landline / mobile number
    mailbox
    mailbox
    address
    address
    巴黎人平台网上 正规棋牌游戏 赌场游戏种类 捕鱼平台注册登录 电子游戏代理 新棋牌捕鱼 正规网上真人下注 真钱电玩注册 金沙棋牌网站 海立方官方网站