现金网导航网站

沈阳顺明电气安装工程有限公司

categories of news

Product Categories

contact us

Shenyang Shunming Electrical Installation Engineering Co., Ltd.

Contact: Manager Sun

Mobile: 13988833938

Mobile: 15940087738

Email: 2367623932@qq.com

Address: No. 32 Xiugong West Street, Tiexi District, Shenyang

Website: pcyisheng.com

What materials need to prepare for the installation of large-scale lamps in Shenyang

Your current location : Home >> News >> Industry knowledge

What materials need to prepare for the installation of large-scale lamps in Shenyang

作者: Release Date: 2019-12-23 Author: Click:

Now when we are decorating, the general needs of the choice of lighting are determined by the details of our home. Many parents will use large lamps when conditions permit. So how to install these large-scale luminaires in Shenyang in detail? Below we will introduce the detailed steps of large-scale luminaires. Please follow along with them.

1. Information: When installing large combined chandeliers, prepare supporting component information, decorative component information, and other accessories information.

1), supporting member information: wood (water standard, wood strip, water board of different standards), aluminum alloy (plate, profile), steel (section steel, flat steel, steel plate);

2) Information of decorative components: copper plate, exterior decorative veneer and heat radiation plate, plastic, plexiglass plate, glass as separator;

3), other accessories information: such as screws, nails, rivets, lighting products, adhesives, etc.

2. Things: The construction things are the pliers, electric jigsaws, screwdrivers, rulers, hammers, electric hammers, hand tools, paintbrushes, etc. that are required in the process of the pendant lamp device.

1. Joining method: The joining of embedded parts and transition pieces is the focus in the joining process.

1) Firstly embed iron pieces or wooden bricks in the structural layer (water bricks bear the load outside);

2) .Install transition joints on pre-buried iron or wooden bricks;

沈阳大型灯具安装

3) Connect the boom and sling with the transition link.

2. Attentions for installation

1) When embedding iron pieces or wooden bricks in the structural layer, the buried position should be accurate and a satisfactory adjustment level should be left;

2) If there are more than one chandelier when installing, pay attention to their position and length. This can effectively save time and labor, and install the chandelier at the same time. If there is an error, you can easily adjust the chandelier. position.

3) Although there are two methods to choose the direct exit method and the casing method, the casing method is more used, because the casing method is more beneficial to the device, and the ceiling lamp can ensure the integrity of the ceiling panel. , Just drill the hole where the pipe is needed. However, it is relatively difficult to find the correct position directly when opening the hole, which may have a great impact on the suspended ceiling and affect the overall aesthetics.

4). It is best to save the height adjustment method when fixing the suspender of the chandelier. It is best to save a certain length of thread, which is easy to adjust. When hanging the light box, carefully check whether the connection is reliable.

The content of the article comes from the Internet. If you have any questions, please contact us!

URL of this article: http://pcyisheng.com/news/487.html

Keywords: Shenyang large-scale lamp installation , Shenyang large-scale lamp installation price , which is good

Recently Viewed:

    online service
    share it One-click sharing
    Welcome to leave us a message
    Please enter your message here and we will contact you as soon as possible.
    Name
    Contact person
    phone
    Landline / mobile number
    mailbox
    mailbox
    address
    address
    巴黎人平台网上 正规棋牌游戏 赌场游戏种类 捕鱼平台注册登录 电子游戏代理 新棋牌捕鱼 正规网上真人下注 真钱电玩注册 金沙棋牌网站 海立方官方网站